Skudo Base Coat 5 Gallons

Application of the Skudo Commercial System consists of two steps. First either the Concrete or Standard Base Coat is rolled or sprayed onto a small section of the surface to at least 10 mils wet.  Then the HT or MT is rolled over the still wet Base Coat and pressed in.

Download

Skudo Mat Systems Application Prep Summary

SKU: 34615 Category: Brands: .

Description


Accessories Packs & Kits

Skudo Commercial Mat Squeegee Installation PACK (1) 24″ Notched Squeegee Blade (1) 24″ Aluminum Squeegee Frame (1) 5 Ft Tapered Wooden Pole (1) Bucket Dolly* (2) 18″ Skudo Roller Frame (2) 18″ Roller Cover 3/16 NAP (2) 5′ Fiberglass Extension Pole (1) Mat Cutter (Box knife)* (1) Cutter replacement blades ( Pack of 5)* (1) Wet Film Gauge * Versions available with and without these items.

Squeegee Installation Kit – (1) 24″ Squeegee Frame, (1) Notched Squeegee Blade, (1) Extension Pole

18″ Roller Kit: (1) Skudo Roller Frame, (1) 18″ Roller Cover, and (1) Extension Pole


Additional Tools for Application & Removal

5 Gallon Bucket Dolly

Squeegee Installation Kit – (1) 24″ Squeegee Frame, (1) Notched Squeegee Blade, (1) Extension Pole

pH Test Kit – For new concrete application of Commercial System.

Wet Film Gauges

Product Video